Install The Management Switch In The Cabinet; Inserting The Server In The Cabinet; Installing The Stabilizer Screws - Dell 100 Series Hardware Installation Manual

Hide thumbs Also See for 100 Series:
Table of Contents

Advertisement

2U4N Configuration Equipment Installation

Install the management switch in the cabinet

VxRack Node Hardware Installation Guide
44
Figure 20 Inserting the server in the cabinet
6. To further secure the rail assembly and server in the cabinet, insert and tighten
a small stabilizer screw directly behind each bezel latch.
Figure 21 Installing the stabilizer screws
7. For management server SW install steps, refer to the latest VxRack Node
Deployment Guide .
There are two cabinet rails (left and right). Each cabinet rail consists of the part that
is installed in the cabinet (slide rail) and the part that is mounted on the side of the
management switch (inner rail).
When the management switch is installed in the cabinet, the rear panel will be facing
the front of the cabinet.
Procedure
1. Separate the inner rails from the slide rails.
2. Install the slide rails in the cabinet with the hardware provided.
CL4962
CL4963

Advertisement

Table of Contents
loading

Table of Contents