Installation Guidelines and Cabinet Stack Up
VxRack Node Hardware Installation Guide
20
Note
Install all the equipment in the cabinet before installing and connecting the power and
I/O cables.
Install the equipment as described in
l
If you are installing the minimum configuration, refer to Table 5 and Figure 3 for
l
the equipment stack up in the cabinet.
If you are installing the maximum configuration, refer to Table 6 and Figure 4 for
l
the equipment stack up in the cabinet.
Component
Description
Function
Data Server
D51B-1U Server
Management Server
Kylin 1U Server
Management Switch
Arista 7010T-48
Data Switch
Arista 7050-64
Equipment Installation
Table 5 Minimum configuration in 3-phase delta power
distribution cabinets
Quantity
3
1
1
2
on page 29.
Cabinet U Space
2 - 4
20
21
23-24