Management Network B, Nodes 23 - 32 Cabling; Management A, Nodes 17 - 22 Cabling - Dell 100 Series Hardware Installation Manual

Hide thumbs Also See for 100 Series:
Table of Contents

Advertisement

Install management network I/O cables

Management network B, nodes 23 - 32 cabling

VxRack Node Hardware Installation Guide
56
Table 11 Management A, nodes 17 - 22 cabling
Source
Node 17 MGMT2
Node 17 MGMT1
Node 18 MGMT2
Node 18 MGMT1
Node 19 MGMT2
Node 19 MGMT1
Node 20 MGMT2
Node 20 MGMT1
Node 21 MGMT2
Node 21 MGMT1
Node 22 MGMT2
Node 22 MGMT1
Use Figure 24 and Table 12 to connect cables for the management network B, nodes
23 - 32.
Destination
Management SwitchA Port 29
Management SwitchA Port 31
Management SwitchA Port 33
Management SwitchA Port 35
Management SwitchA Port 37
Management SwitchA Port 39
Management SwitchA Port 41
Management SwitchA Port 43
Management SwitchA Port 38
Management SwitchA Port 40
Management SwitchA Port 42
Management SwitchA Port 44

Advertisement

Table of Contents
loading

Table of Contents