System Installation; Checking Before Installation - Huawei 01075345 User Manual

Hide thumbs Also See for 01075345:
Table of Contents

Advertisement

SUN2000-(2KTL-6KTL)-L1
User Manual

4.1 Checking Before Installation

Outer Packing Materials
Before unpacking the inverter, check the outer packing materials for damage, such
as holes and cracks, and check the inverter model. If any damage is found or the
inverter model is not what you requested, do not unpack the package and contact
your supplier as soon as possible.
Package Contents
● After placing the equipment in the installation position, unpack it with care to
After unpacking the inverter, check that the contents are intact and complete. If
any damage is found or any component is missing, contact your supplier.
Issue 10 (2023-02-13)
NO TE
You are advised to remove the packing materials within 24 hours before installing the
inverter.
NO TICE
prevent scratches. Keep the equipment stable during unpacking.
NO TE
For details about the number of contents, see the
Copyright © Huawei Technologies Co., Ltd.
4

System Installation

Packing List in the packing case.
4 System Installation
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents