After the installation is complete, check the items listed in the following tables.
Perform the power-on operation only after all items are verified.
Table 7-1 Checking hardware installation
No.
1
2
3
4
5
Table 7-2 Checking electrical connections
No.
1
2
3
4
Issue 02 (2022-08-10)
7
Expected Result
The cabinet is clean, without redundant screws,
copper wires, or other debris.
The paint on the cabinet exterior is intact.
The cabinet door and lock work properly.
All safety marks and warnings are correct, clear, and
complete.
There are no sundries such as adhesive tape, cable
tie, paper scrap, or packing material around the
cabinet.
Expected Result
All cables are securely connected.
Ground cables are securely connected.
Power cables and ground cables are not coiled and
extra parts are cut off.
The phase sequence is correct.
Copyright © Huawei Digital Power Technologies Co., Ltd.

Verifying the Installation

7 Verifying the Installation
Check Result
□ Passed □
Failed
□ Passed □
Failed
□ Passed □
Failed
□ Passed □
Failed
□ Passed □
Failed
Check Result
□ Passed □
Failed
□ Passed □
Failed
□ Passed □
Failed
□ Passed □
Failed
28