Verifying The Installation - Huawei FusionModule1000A20 Installation Manual

It solution
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 IT Solution
Installation Guide (2016.05, AI Version)
Step 2 According to the current needs of the cable marked cable select the corresponding label.
Step 3 Remove the simple labels attached to a cable during cable routing, and attach the selected
labels to both ends of the cable on the cable label tags.
----End

10.8 Verifying the Installation

After external cables are installed, verify the installation as illustrated in
normal use of products and enable subsequent installation.
Table 10-1 Installation checklist
No.
1
2
3
Issue 02 (2017-01-10)
The label information must be clear and specific.
Labels must be easy to attach.
Labels must be resistant to corrosion and deterioration.
Labels must be securely attached.
Labels must be attached in eye-catching positions on cables for ease of maintenance.
The labels on both ends of a cable must be correct.
Check Item
Cable appearance
Cable connections
Cable layout
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Check
Expected Result
Method
Observe
Cable sheathings are properly
wrapped and free from obvious
damage.
Hoses that contain cables are intact.
Cables are connected in the designed
Observe
positions.
Terminals are prepared in accordance
with specifications, and terminals are
securely connected.
Labels on both end of each cable are
clear, specific, and in the same
direction.
Observe
Cables are neat, pleasing, and not
coiled. Extra parts are cut off.
Cable ties do not overlap, and the
joints are evenly cut without burrs.
10 Cable Installation Techniques
Table 10-1
to ensure
81

Advertisement

Table of Contents
loading

Table of Contents