FusionModule1000A20 IT Solution
Installation Guide (2016.05, AI Version)
Materials: DN32 PP-R pipe (with an outer diameter of 32 mm, to be purchased onsite), PP-R
pipe connector, 10 mm thick thermal insulation foam, thermal insulation foam glue
Document: container layout diagram
Skill requirement: skilled technicians
Procedure
Step 1 Locate a drain port based on the water refill and drainage pipe layout diagram. Remove the
adhesive silver paper that seals the exposed pipe connector on the container, as shown by (1)
in
Figure
Step 2 Connect the PP-R pipe connector to the pipes on both ends using a hot melt device, as shown
in
Figure
Figure 7-3 Installing drainpipes
(1) Silver paper
Step 3 Wrap the exposed parts of the pipes with 10 mm thick thermal insulation foam.
----End
Follow-up Procedure
Verify that the PP-R pipe connector is closely melted with the pipes at both ends.
Issue 02 (2017-01-10)
For the diagram, see the quick installation guide for the solution in use.
The container layout diagram illustrates only the positions of water refill and drain ports on
containers and does not involve pipe routes and connections.
7-3.
7-3.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Installing External Cooling Devices