Removing The Filling Strainer; Figure 5: Removing Thumb Screws - ABB ZSD 2020 Overhaul Instructions

Central lubrication unit
Hide thumbs Also See for ZSD 2020:
Table of Contents

Advertisement

Date: 2021-01-13
Version: 1.2
3.3

Removing the filling strainer

• Unscrew the two thumb screws (40).

Figure 5: Removing thumb screws

Item number
(40)
© 2021 ABB Automation GmbH |
Overhaul instructions
Central lubrication unit
Removing
Designation
Thumb screw
Page 19 of 50
en

Advertisement

Table of Contents
loading

This manual is also suitable for:

3hda10100097017

Table of Contents