Figure 29: Fitting Tubes - ABB ZSD 2020 Overhaul Instructions

Central lubrication unit
Hide thumbs Also See for ZSD 2020:
Table of Contents

Advertisement

Date: 2021-01-13
Version: 1.2
• Connect all plastic tubes (33).

Figure 29: Fitting tubes

Item number
(33)
• Start the system and check the correct function of each component.
© 2021 ABB Automation GmbH |
Overhaul instructions
Central lubrication unit
Installation
Designation
Plastic tubing PLN-8x1.25-NT
Page 44 of 50
en

Advertisement

Table of Contents
loading

This manual is also suitable for:

3hda10100097017

Table of Contents