Cleaning And Assembly Preparation - ABB ZSD 2020 Overhaul Instructions

Central lubrication unit
Hide thumbs Also See for ZSD 2020:
Table of Contents

Advertisement

Date: 2021-01-13
Version: 1.2
4

Cleaning and assembly preparation

All parts are cleaned with commercially available industrial cleaners and checked for wear.
Only new wear parts are installed.
Seals and bearing surfaces must be lubricated with petroleum jelly or a high-quality rolling
bearing grease before assembly.
The bearing surfaces of the screw heads and threads are treated as well.
The following tightening torques must be observed:
M1,7 (SMC SYJ3...)
M3 (SMC SYJ7...)
M4
M5
M6
M8
Table 3: Tightening torques
© 2021 ABB Automation GmbH |
Overhaul instructions
Central lubrication unit
Cleaning and assembly preparation
0,12 Nm
0,8 Nm
2,1 Nm
4,3 Nm
8,6 Nm
21 Nm
M8-12.9
M10
M10-12.9
M12
M12-12.9
M16-10.9
Page 33 of 50
25 Nm
40 Nm
45 Nm
45 Nm
50 Nm
60 Nm
en

Advertisement

Table of Contents
loading

This manual is also suitable for:

3hda10100097017

Table of Contents