LG A9K-PRO1G Owner's Manual page 19

Table of Contents

Advertisement

Available languages

Available languages

global_main.book.book Page 19 Tuesday, March 23, 2021 2:52 PM
to the wall by tightening the anchoring screw
all the way.
d
8
Plug the power cord into the power outlet.
NOTE
• The charging station can be removed as needed.
To remove it, hold the floor stand dock steady
and pull up on the charging station.
Using Double-Sided Tape to Secure
the Appliance
1
Use the double-sided tape
anchoring block
to the charging station.
b
• Remove the centre section of double-sided
tape before attaching it to the wall
anchoring block.
2
Wall-Mounted Installation
For wall-mounted installations, the charging
station must be attached securely to the wall using
the provided(short) wall anchoring screws.
• The detachable nozzle storage cannot be
1
2
to attach the wall
a
INSTALLATION
Attach the second piece of double-sided tape
to the other side of the wall anchoring block to
secure it to the wall.
• Do not use double-sided tape on wallpaper.
attached to the charging station in a wall-
mounted installation.
Connect the power adapter to the port on the
back of the charging station.
Drill 2 holes and insert the drywall anchors(if
needed) at least 1 m from the floor and near
enough to easily reach a power outlet.
• Before drilling, make sure that there are no
pipes or electrical wires inside the wall at the
desired location.
• For drywall anchor: use 6.5 mm drill bit
• For concrete or wall stud: use 3 mm drill bit
19

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

A9 series

Table of Contents