Hitachi Relion REB670 Commissioning Manual page 100

Table of Contents

Advertisement

Section 10
Testing functionality by secondary injection
Table 18:
Set value: Mode
L1, L2, L3
Arone
PosSeq
L1L2
L2L3
L3L1
L1
L2
L3
2.
Adjust the injected current and voltage to the set values in % of IBase and UBase (converted to
secondary current and voltage). The angle between the injected current and voltage shall be
set equal to the set direction Angle1, angle for stage 1 (equal to 0° for low forward power
protection and equal to 180° for reverse power protection). Check that the monitored active
power is equal to 100% of rated power and that the reactive power is equal to 0% of rated
power.
3.
Change the angle between the injected current and voltage to Angle1 + 90°. Check that the
monitored active power is equal to 0% of rated power and that the reactive power is equal to
100% of rated power.
4.
Change the angle between the injected current and voltage back to 0°. Decrease the current
slowly until the START1 signal, start of stage 1, is activated.
5.
Increase the current to 100% of IBase.
6.
Switch the current off and measure the time for activation of TRIP1, trip of stage 1.
7.
If a second stage is used, repeat steps
94
Calculation modes
Formula used for complex power calculation
=
S
U
L
EQUATION1697 V1 EN-US
=
S
U
L L
EQUATION1698 V1 EN-US
= ×
S
3
U
EQUATION1699 V1 EN-US
=
S
U
L L
EQUATION1700 V1 EN-US
=
S
U
L L
EQUATION1701 V1 EN-US
=
S
U
L L
EQUATION1702 V1 EN-US
= ×
S
3
EQUATION1703 V1 EN-US
= ×
S
3
U
EQUATION1704 V1 EN-US
= ×
S
3
U
EQUATION1705 V1 EN-US
© 2017 - 2022 Hitachi Energy. All rights reserved
*
*
×
+
×
+
×
I
U
I
U
I
1
L
1
L
2
L
2
L
3
*
*
×
-
×
I
U
I
1 2
L
1
L L
2 3
L
3
*
×
I
PosSeq
PosSeq
*
*
×
-
(
I
I
)
1 2
L
1
L
2
*
*
×
-
(
I
I
)
2 3
L
2
L
3
*
*
×
-
(
I
I
)
3 1
L
3
L
1
*
×
U
I
L
1
L
1
*
×
I
L
2
L
2
*
×
I
L
3
L
3
2
to
6
for the second stage.
1MRK 505 372-UEN Rev. K
*
L
3
(Equation 4)
(Equation 5)
(Equation 6)
(Equation 7)
(Equation 8)
(Equation 9)
(Equation 10)
(Equation 11)
(Equation 12)
Busbar protection REB670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents