Use COMBITEST test system to prevent unwanted tripping when the handle is withdrawn, since
latches on the handle secure it in the half withdrawn position. In this position, all voltages and
currents are restored and any re-energizing transients are given a chance to decay before the trip
circuits are restored. When the latches are released, the handle can be completely withdrawn from
the test switch, restoring the trip circuits to the protection IED.
If a test switch is not used, perform measurement according to the provided circuit diagrams.
9.4

Connecting the test equipment to the IED

Connect the test equipment according to the IED specific connection diagram and the needed input
and output signals for the function under test. An example of a connection is shown in figure 9.
Connect the current and voltage terminals. Pay attention to the current polarity. Make sure that the
connection of input and output current terminals and the connection of the residual current conductor
is correct. Check that the input and output logical signals in the logic diagram for the function under
test are connected to the corresponding binary inputs and outputs of the IED under test.
IEC09000652 V1 EN-US
Figure 9:
62
Never disconnect the secondary connection of a current transformer circuit without
first short-circuiting the transformer's secondary winding. Operating a current
transformer with the secondary winding open will cause a massive potential build up
that may damage the transformer and cause personal injury.
To ensure correct results, make sure that the IED as well as the test equipment are
properly earthed before testing.
IL1
IL2
IL3
IN
UL1
UL2
UL3
UN
IEC 61850
Connection example of the test equipment to the IED when test equipment is
connected to the transformer input module
© 2017 - 2022 Hitachi Energy. All rights reserved
IL1
IL2
IL3
IN (I4,I5)
UL1
UL2
UL3
UN
UN (U4,U5)
TRIP L1
TRIP L2
TRIP L3
IEC09000652-1-en.vsd
1MRK 505 372-UEN Rev. K
M11744-2 v9
Busbar protection REB670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents