Hitachi Relion REB670 Commissioning Manual page 165

Table of Contents

Advertisement

1MRK 505 372-UEN Rev. K
13.4
Repair support
If an IED needs to be repaired, the whole IED must be removed and sent to an Hitachi Power grids
Logistic Center. Before returning the material, an inquiry must be sent to the Hitachi Power grids
Logistic Center.
e-mail: offer.selog@se.Hitachi Power grids.com
13.5
Maintenance
The IED is self-supervised. No special maintenance is required.
Instructions from the power network company and other maintenance directives valid for
maintenance of the power system must be followed.
Busbar protection REB670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved
Section 13
Troubleshooting
M11768-3 v4
M11769-3 v2
159

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents