ABB ACS880-207LC Hardware Manual page 59

Igbt supply units
Hide thumbs Also See for ACS880-207LC:
Table of Contents

Advertisement

conductors. Twist the shield to form a PE conductor, and mark it with yellow-green
tape or heat-shrink tubing.
5.
For each cable, attach cable lugs at the end of the PE conductor (twisted shield)
and phase conductors.
4
WARNING!
Apply grease to stripped aluminum conductors before attaching them to
non-coated aluminum cable lugs. Obey the grease manufacturer's
instructions. Aluminum-aluminum contact can cause oxidation in the
contact surfaces.
6.
For each cable, attach the conductive sleeve to the bare cable shield with a cable
tie. Attach the cable to the support bracket with a clamp.
7.
For each cable, connect the PE conductor to the PE busbar, and the phase
conductors to the phase terminals. Tighten the screws to the torque given in the
technical data. Use the bolts and washers in the delivery. Refer to
in cable lug connections (page
6
8.
If there are more than 3 cables, attach additional cable support brackets for them.
5
56).
7
Electrical installation 59
11
Use of fasteners

Advertisement

Table of Contents
loading

Table of Contents