Installation of the control unit on the BEKOMAT
1. Check whether or not the service unit (9)
goes with the control unit (1) (model
designation and colour of the arresting hook).
2. Check whether or not the sealing mat (8)
and the contact springs (28) are clean,
dry, and free from impurities.
3. Introduce the sensor (5) into the service unit (9).
4. Hang the hook (29) of the control unit (1)
in the service unit (9).
5. Press the control unit (1) against
the service unit (9) and snap into place.
Start-up subsequent to maintenance measures:
Always carry out prior to the start-up:
•
Leak test of the screwed connector of the
condensate receiver tank and of the connection
of this tank to the service unit
•
Check of the electrical connections
•
Check of the correct engagement of the control
unit