4
Connecting Power Cables
1. Keep the screw terminals in the correct status, as shown in the rightmost figures. Connect cables to the
correct terminals and tighten the screws clockwise. Pull the power cables to check that the cables are securely
connected. Check that the screws are in the required status. (Use an M5 torque screwdriver with a torque of
2.0±0.2 N·m.)
2. Select a cable clip based on the cable size. Install the cable clip and use screws to secure the cables. (Use an
M4 torque screwdriver with a torque of 1.2 N·m.)
3. Pull the power cables to ensure that they are securely connected.
In the following figure, the power cable is routed in from the middle.
Recommended cable
Recommended cable
x 2
diameter: 19.5–23 mm
diameter: 14.5–19.5 mm
10
When five 10 mm2
cables are routed in
from the bottom,
it is recommended that
no more than two layers
of cables be stacked.
The following cables comply with the IEC 60446 standard. Cable colours may vary according to different regions.
Connect power cables based on the actual phase condition.
TN and TT systems are configured with neutral conductors. IT systems do not have neutral conductors.
The AP07N-EU supports TN&TT 1-phase and IT 1-phase.
The AP22N-EU supports TN&TT 3-phase, TN&TT 1-phase, and IT 1-phase.
TN&TT 1-phase
L1
L2
230V
230V
L3
N
PE
PE N
L1
TN&TT 3-phase
L1
400V
L2
230V
230V
L3
230V
N
PE
PE
N
L3
L2 L1
For a TT system, connect cables by referring to the
TN system cabling imprint on the rear cover.
IT 1-phase
L1
230V
L3
PE
PE L3
L1
11