Service Procedure; Initial Io Hours Service - Komatsu D32E-1 Operation & Maintenance Manual

Bulldozer
Hide thumbs Also See for D32E-1:
Table of Contents

Advertisement

24. SERVICE PROCEDURE
24.1 INITIAL 10 HOURS SERVICE
24.1 .I
BLADE CUTTING EDGE HARDWARE
Check the torque of the blade cutting edge hardware.
U
Plow bolt nuts:
455 Narn (335 Ibf ft)
24.1.2 TRACK SHOE BOLT TORQUE
The bolts
used
for attaching the track shoes to the tracks are heat treated
alloy bolts and will stand a considerable
tightening
strain. Ordinary bolts
must not be used. Nuts must be assembled
so that washer face is not
against track link. Radius side of nuts must be against track link. Torque
bolts to below listed value.
U
Track shoe bolt:
90 220 Nom (65 f15 Ibf ft) plus 120"
+
120" designates two flats of bolt head.
3-25

Advertisement

Table of Contents
loading

Table of Contents