Panasonic PAW-160MAH3M Installation Instructions Manual page 38

Air handling unit kit
Table of Contents

Advertisement

Product description
Refrigerant charge at shipment fitted for pipe length within 30 m
Pipes additional refrigerant charge: 0.03 kg/m
AHU DX coil additional refrigerant charge: 0.83 kg/dm³
Refrigerant charge at shipment is sufficient for AHU DX coil volume up to 1.8 dm³
Total additional refrigerant charge calculation
((2.1 dm³ – 1.8 dm³) x 0.83 kg/dm³) + (10 m x 0.03 kg/m) = 0.249 kg + 0.3 kg = 0.549 kg
Calculation example for number of passes in the heat exchanger
The minimum number of passes in the AHU heat exchanger is restricted. The limit is calculated by
the formula:
Minimum number of passes
= Number of steps × Distance between tube sheets × Number of rows × 1.5 × 10
The calculated value must then be rounded up to the next integer number.
Example
Number of steps: 12
Distance between tube sheets: 1,000 mm
3
Number of row: 3
Minimum number of passes = 12 × 1,000 x 3 × 1.5 × 10
This value must be rounded up to 6.
This means that the minimum number of passes is 6 passes.
ATTENTION
!
Nuisance tripping of high-pressure switch
The outdoor unit is equipped with a high-pressure switch, which stops the operation of the air-
conditioning unit for protection when the set high-pressure limit is exceeded. Nuisance tripping of
the high-pressure switch may occur in heating mode if the heat exchanger pipe thermistor (E2) is
not properly positioned or if the limit is not properly set.
► Position the heat exchanger pipe thermistor (E2) correctly and set the limit properly in
38
accordance with the instructions given in this document.
–4
= 5.4
–4
AHU Kit – Installation Instructions – 07/2023

Advertisement

Table of Contents
loading

This manual is also suitable for:

Paw-280mah3mPaw-560mah3mPaw-280pah3m-1

Table of Contents