Related Publications
Publication
Brochure
Snapshot
Installation Manual AKD-10
Installation Manual AKD-8
Installation Manual AKD-6
Installation Manual AKD-5
Accessory: Door Interlock (Door Interlock Kit)
Accessory Retrofill Doors Assembly
Accessory: Position Switch Plate & Position Switch Assembly & Wiring (Position Switch Kit)
Accessory: Neutral Rogowski CT Disconnect (Neutral Assemblies)
Accessory: Programmer Disconnects
Accessory: Finger Clusters (Cluster Assemblies)
Accessory: Secondary Disconnects
FAQ
Application Guide
Guideform Spec
Spare/Renewal Parts Guide
Service and Support
In addition to the local field sales office and service teams, ABB also has a dedicated aftermarket team
to assist customers with legacy information, selection, ordering, and upgrading.
Estimated Time to Complete Tasks
It takes about 20 minutes to install a feature-for-feature LSI assembly. This includes racking out the old
breaker, racking in the new breaker, and replacing the door. If new options are desired, or if it's a 4-wire
LSIG circuit or modifications are needed to the cubicle, then additional time is required. Time also does
not include wiring the secondary disconnect on the retrofill.
Description
Product Specs
AKD-5 Low Voltage Switchgear is a free-standing assembly of metal-enclosed ANSI power circuit
breakers. It may also be a part of a single-ended or double-ended load center unit substation. Figure 1
shows the retrofill circuit breaker projected out of its cassette.
in the cassette.
6 EntelliGuard R Circuit Breaker Retrofill AKD-5 Installation Manual
Publication Number
DEA-532
DEE-543
DEH-41550
DEH-41549
DEH-41548
DEH-41547
DEH-41529
DEH-41563
DEH-41530
DEH-41531
DEH-41532
DEH-41533
DEH-41534
DEQ-171
DET-753
DET-754
DET-755
Figure 2
shows the AK25 retrofill breaker
DEH-41547