Section 2

Setup and Operation

This section provides setup and operation information for the NEC Versa 4000 series sys-
tem (including cabling, power-on verification and using Auto Setup).

UNPACKING THE SYSTEM

Find an area away from devices that generate strong magnetic fields (electric motors,
transformers, etc.). Place the shipping carton on a sturdy surface and carefully unpack the
system. The carton contents include the system, AC adapter, AC power cord, battery, soft-
ware diskettes, and user documentation.

HARDWARE SETUP

When connecting power and signal cables, do the following.
1.
Make sure that the system is powered off.
The power switch turns the system on or off. Slide the switch right to turn it on,
slide the switch again to turn it off.
2.
Observe connector alignment marks and keys (when present).
3.
Connect the AC adapter cable to the power connector port as shown in Figure
Section 2-8.
Connect the end of the power cord to the AC input connector on the AC adapter.
4.
5.
Connect the other end of the power cord to an AC power source.
6.
Ensure that all connections are properly seated and secure.
7.
When removing or replacing cables, grasp and pull gently on the attached con-
nectors.
NOTE: If operating the system on DC power,
verify that the system has a charged battery pack
installed. For information on connecting the AC
adapter to recharge the battery pack during or
after use, see "Recharging the Battery Pack" in
the following section.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents