Install Battery Backup Module - D-Link DSN-6020 User Manual

10gbe iscsi to sata ii / sas raid ip san storage
Hide thumbs Also See for DSN-6020:
Table of Contents

Advertisement

2.4 Install battery backup module

To install the IP SAN storage with a battery backup module, please follow the procedure.
1.
BBM (Battery Backup Module) supports hot pluggable. Regardless of the IP SAN
storage is turned on or off.
2.
Remove the cover of BBM.
3.
Insert the BBM.
4.
Tighten the BBM and use screws to lock the both sides.
5.
Done.
BBM Status Button:
When the system power is off, press the BBM status button,
if the BBM LED is Green, then the BBM still has power to
keep data on the cache. If not, then the BBM power is ran
out and cannot keep the data on the cache anymore.
Management port.
Console port.
RS 232 port for UPS.
SAS JBOD expansion port.
Figure 2.4.1
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dsn-640Dsn-6410Dsn-654Dsn-6420Dsn-6410w/640

Table of Contents