Sharp FO-1470 Service Manual page 82

Service manual
Hide thumbs Also See for FO-1470:
Table of Contents

Advertisement

UX-510UA
FO-1470U
2. Description
2-1. Extension board unit
1. Remove the TEL/LIU PWB, control PWB and Power Supply PWB
from this unit, and mount the extension board unit instead.
Before connecting the wiring to the extension board unit, set the
test PWB switches to the fixed position.
2. The setting is as follows.
Cable
CNPW
DOOR SW
1
CNLIUA
CNLIUA
14
J17
TP2
J13
CHECK
CHECK
TEL/LIU
CONTROL
PWB
PWB
A set with a mounted
extension board unit
Connector
Cable
CNPN2
QCNW-4723SCZZ
CNTH2
CCNW-4759SC01
CNCCD2
QCNW-4725SCZZ
CNMT2
QCNW-4726SCZZ
CNLED2
QCNW-4727SCZZ
CNSP2
QCNW-4728SCZZ
CNCS2
QCNW-4729SCZZ
CNPH2
QCNW-4731SCZZ
CNBZ2
QCNW-4732SCZZ
CNSNS
QCNW-4730SCZZ
POWER
SUPPLY
PWB
RBNSNS
PINSNS
Cable color
CNSNS
1. Brown
RHS
2. Red
DRSNS
3. Orange
N.C.
4. Yellow
RBN
5. Green
PIN
The hook switch are operated by OR of the mechanical unit switch and
the test PWB switch. When performing installation in the machine unit,
set the test PWB switches to the fixed position.
Mechanical unit
Actual operation with mechanical unit
Hook SW
ON/OFF operation
PWB sensor check
ON-HOOK
Hook SW
* Recording paper: ON
No recording paper: OFF
UNIT
Note: For the thermal head cable only, connect to the relay cable, not to
the relay PWB.
8 – 2
Connected to (PWB)
TP2 (TEL/LIU)
DOOR SW (Control)
—————
RBNSNS (Control)
PINSNS (Control)
PWB to be tested
ON-HOOK
ON/OFF operation
DON'T SEPARATE
RELAY CABLE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ux-510a

Table of Contents