Download Print this page

GE CV936 Owner's Manual & Installation Instructions page 15

Vented range hoods

Advertisement

Available languages

Available languages

Installation instructions
_Alternate
Mounting
Method
iNSTALL HOOD TO SOFFIT
OR BENEATH CABINETS
IMPORTANT:
For additional
support
and to minimize
vibration
during operation,
we strongly
recommend
that the hood
also be secured
to the back wall with
wall fasteners.
SKIP THiS STEP IF USING WALL MOUNTING
METHOD
IMPORTANT: Soffit framing
must be capable
of supporting 100 Ibs.
When
necessary,
the hood
may be installed
so that
it is supported
by the soffit.
* The
soft=it should
be constructed
with 2 x 4's.
* Determine
the installation
location.
* Continue
the centerline
forward
on the bottom
of the cabinet
or soffit.
30" Models
"A"
"B"
Centerline to
Opening
Center of Stud
For Ductwork
14-1/2"
10-3/4"W x 8-7/16"D
Mounting
screws must
be secured
to 2 x 4 studs
(Dim.
"A") at locations
shown
in the above
chart.
* Allow minimum
opening
(Dim.
"B") to
accommodate
the duct transition
in the sofIlt.
t
24/8"
RearWall
I
I
4 3/8
'
:T
(_
',8-7/16"
.........
_.........
] 1
I
TopView, FrontSide
2-9/16"
7-1/16"
f
2-1/4"
30"Models
_14-1/2'_1R_14-1/2
'_
t
2-3/8"
10-3/4"_
',8#/16"
I
"
/
.........
4.........
i ;
I
29-7/8"
TopView, FrontSide
* Drill four 1/8" pilot boles in locations shown.
- If mounting
to the underside
of a cabinet with
a recessed bottom,
install shims to fill the gap.
i.........
:
Cabinet
or
Soffit
1/4" Gap
EngageKeyhole Slots
andPushBack
to Wall
]
AddShims
If Bottom
Is Recessed
Back
Wall
* Drive
mounting
screws into
the studs
until they
protrude
1/4".
Tiffs 1/4"
gap will provide
clearance
to engage
the keyhole
slots in the top of the hood.
* i,if_ hood
onto
mounting
screws.
Slide back against
the rear
wall.
* Pull house
wiring
through
the knockout
at the rear
or the top of the hood.
* Tighten
mounting
screws.
Cut a 10-3/4"x 8-7/16" hole through bottom of soffit or cabinet for
duct transition as shown.
15

Advertisement

loading