Air Conditioning; Cooling Capacity - NEC Express 5800 User Manual

Express5800 system rack
Hide thumbs Also See for Express 5800:
Table of Contents

Advertisement

Air Conditioning

A properly sized air conditioning system ensures stable and reliable operation of
your servers by performing the following tasks:
cooling the system
!
preventing the generation of static charges
!
preventing the formation of corrosion causing condensation within the
!
system.
The system rack's temperature and humidity requirements are listed in
Table 2-2.
Table 2-2. Temperature and Humidity Requirements
Item
Temperature
Relative humidity
Temperature and humidity should be measured 19.5 inches (50cm) from the
system and 3.3 ft (1m) above the floor.
To satisfy temperature and humidity requirements, an air conditioner should be
capable of heating, humidifying, and dehumidifying.
Heat is needed to precisely control temperature, increase computer room
temperature in winter to the system's operating conditions, and to control
humidity.
Humidifying is required to combat low humidity, which allows static charges to
build-up.
If the system is operated in high-humidity conditions where condensation can
occur, long term reliability may be affected.

Cooling Capacity

The cooling capacity of an air conditioner is determined by the following
factors:
90% of the total calorific value of the system (allowing for expansion)
!
calorific value from the ceiling, walls, and windows
!
calorific value generated by personnel
!
calorific value of lighting and additional machines
!
humidity control effects.
!
Operating
Non-operating
16 - 30°C
0 - 45°C
40 - 70%
10 - 80%
(non-condensing)
Planning Your Site 2-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

42u36u27u

Table of Contents