Siemens SATURN IIE EPABX Installation Test Procedures page 54

Epabx
Table of Contents

Advertisement

SATURN IIE EPABX
installation Test Procedures
STEP
PROCEDURE
If additional tests or procedures are
5 A
to be performed, hook-flash the main-
tenance test phone and dial the next
code (Diagnostic Test Access Code is
not redialed).
5B
If no additional tests or procedures are
to be performed place the main-
tenance test phone on-hook.
pages)
6-28 (28
Table 6.13 Takinq Circuit(s) Out-of-Service IContinucdl
. ,
VERIFICATION
Recall dial tone is returned.
None.
Issue 1, May 1986
IF VERIFICATION
IS NOT OBTAINED

Advertisement

Table of Contents
loading

This manual is also suitable for:

Saturn iie

Table of Contents