Table 2-3: Floor Load Rating and Clearances: Single Rack
Floor Load Rating
kg/m
500 (102.4)
450 (92.2)
400 (81.9)
350 (71.7)
300 (61.4)
NOTE: For safe and efficient maintenance operations, clearance (c) should
be made as large as possible. Actual clearances for installation should be
determined after consulting with the site/facilities manager, as clearances
can vary, depending on building conditions.
2–10
Hitachi Universal Storage Platform VM Installation Planning Guide
2
2
(lb./ft.
)
C=0
0.2
0.2
0.2
0.3
0.6
Installation Requirements
Required Clearance (a+b) m
Clearance (c) m
C=0.2
C=0.4
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.4
0.3
0.2
C=0.6
C=1.0
0.2
0.2
0.2
0.2
0.2