Step 8: General Purpose Equipment Control - Mitsubishi Electric G-50A Technical Manual

Air conditioning network system centralized controller g-50a and integrated centralized control software tg-2000a
Hide thumbs Also See for G-50A:
Table of Contents

Advertisement

11. Step 8: General Purpose Equipment Control

TG-2000A can control and monitor system equipment.
By using general-purpose control functions, you can control and monitor other manufacturer's air
conditioning units, lighting fixtures and other system equipment as well as water level of a water or fire tank
with a flooding/low level alarm on the TG-2000A monitor screen.
System equipment is controlled by PLC. "General-purpose control software: PAC-YG21CDA" needs to be
installed in PLC. (For PAC-YG21CDA Ver.1 series, no licensing registration needed for G-50A.)
Other systems
PLC (general purpose control
software installed)
TG-2000A
CAUTION
Figure 11-1 General purpose control system composition
Operation and monitoring of general purpose system equipment cannot be
controlled if the PLC or other equipment fails. Take this into consideration, and
make sure you provide a circuit for a switch for an emergency stop/start. Do not
use it for monitoring the system affecting human life. In case you do, incorporate
an alternative safety mechanism.
Lighting
Other manufacturer's packaged
air-conditioning units
Other manufacturer's fan coil units
Chiller/heat source
machine
General purpose system equipment
73

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tg-2000a

Table of Contents