11.2.3 PLC assignment

After you determine the control items of the connected instrument, assign PLC terminals.
General-purpose control PLC needs to have one DI board and one DO board mounted regardless of the
control items. (There are certain restrictions about the mounting location and others. Refer to 12.3 for
details.)
Table 11-3 shows the general-purpose control PLC terminal assignment. Since each terminal in PLC has a
pre-determined function, keep the terminal un-connected (open) where the signal is not to be used.
Item
Number of general-purpose instrument that
can be connected to one PLC
Number of general-purpose control PLC that
can be connected to TG-2000A
IP address setting range for general-purpose
control PLC
Control instrument
Terminal
number
board number
General-purpose
instrument 1
General-purpose
instrument 2
General-purpose
instrument 3
General-purpose
instrument 4
General-purpose
instrument 5
General-purpose
instrument 6
General-purpose
instrument 7
General-purpose
instrument 8

11.2.4 Required materials

Members required for general-purpose control are listed in the Table 9-3.
Materials (model names)
PC for centralized control
Integrated software (PAC-TG2000A)
Web monitor license
PLC
General-purpose control software
(PAC-YG21CDA)
76
Table 11-2 General-purpose control PLC restrictions
Up to 8 units
20 units
192.168.1.171 ~ 192.168.1.190
Table 11-3 General-purpose control PLC terminal assignment
DI board
1
General-purpose instrument 1 ON signal
2
General-purpose instrument 1 OFF signal
3
General-purpose instrument 2 ON signal
4
General-purpose instrument 2 OFF signal
5
General-purpose instrument 3 ON signal
6
General-purpose instrument 3 OFF signal
7
General-purpose instrument 4 ON signal
8
General-purpose instrument 4 OFF signal
9
General-purpose instrument 5 ON signal
10
General-purpose instrument 5 OFF signal
11
General-purpose instrument 6 ON signal
12
General-purpose instrument 6 OFF signal
13
General-purpose instrument 7 ON signal
14
General-purpose instrument 7 OFF signal
15
General-purpose instrument 8 ON signal
16
General-purpose instrument 8 OFF signal
Table 11-4 General-purpose control required items
Maker
PC/AT compatible
Mitsubishi Electric
Mitsubishi Electric
Mitsubishi Electric
Mitsubishi Electric
Content
8 units regardless of the control items
Number of general-purpose instrument:
160
Recommended setting range is shown.
General-purpose instrument 1 operation status signal
General-purpose instrument 1 error status signal
General-purpose instrument 2 operation status signal
General-purpose instrument 2 error status signal
General-purpose instrument 3 operation status signal
General-purpose instrument 3 error status signal
General-purpose instrument 4 operation status signal
General-purpose instrument 4 error status signal
General-purpose instrument 5 operation status signal
General-purpose instrument 5 error status signal
General-purpose instrument 6 operation status signal
General-purpose instrument 6 error status signal
General-purpose instrument 7 operation status signal
General-purpose instrument 7 error status signal
General-purpose instrument 8 operation status signal
General-purpose instrument 8 error status signal
Verified the performance of IBM, DELL, and Hp Compaq.
Refer to Table 6-4 for the PC specification.
Use Ver. 4.1 or later version.
Requires for each G-50A.
Make sure DI board and DO board are mounted.
This software should be installed in PLC.
The software is different depending on IP address. IP
address needs to be designated. (Standard: 192.168.1.171)
Remarks
DO board
Remarks