Download Print this page

Motorola AP-5181 Deployment Manual page 18

Hide thumbs Also See for AP-5181:

Advertisement

18
AP5181 Access Point
4. Remove and retain the nut with a captive locking washer. This nut releases a solder-less ring terminal.
5. Loosen the gland nut on the power entry fitting.
6. Expose 6 inches of wire from the jacket. Only use wire suited for your specific installation requirements
and application. Use 3 conductor wire of a gage suitable for the required wire run.
7. Feed the wire through the power fitting. Do not tighten the fitting at this time.

Advertisement

loading