Diagnosis; Power On Sequence - Pioneer BDP-320 Service Manual

Blu-ray dis player
Hide thumbs Also See for BDP-320:
Table of Contents

Advertisement

1

5. DIAGNOSIS

QQ
3 7 63 1515 0

5.1 POWER ON SEQUENCE

A
Pressing of the POWER key is detected by the IC4001 Submicrocomputer on the MAIN Assy.
The IC4001 then outputs a POWER_ON signal to the POWER SUPPLY UNIT.
After receiving the POWER_ON signal, the POWER SUPPLY UNIT activates, secondary
Power[SW+12 V], setting it to ON.
The R8A34019BG (IC1001), the core LSI, starts up. {RS-232C connector CN1601,
B
log it to ON}
Communication between the R8A34019BG and the DDR2 SDRAM starts.
Communication between the R8A34019BG and the FLASH_IC starts.
C
It takes about 1 minute to complete the startup process.
TE
L 13942296513
D
E
www
F
22
1
http://www.xiaoyu163.com
2
x
ao
y
.
i
2
http://www.xiaoyu163.com
3
8
Q Q
3
6 7
1 3
u163
.
BDP-320
3
4
2 9
9 4
2 8
1 5
0 5
8
2 9
9 4
m
co
4
9 9
2 8
9 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents