5-4-9 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass'y Removal
1) Remove the Belt Pulley. (Refer to Fig. 5-38)
2) Remove the Gear Loading Drive Œ after releasing
Hook [A] in the direction arrow as shown in detail
drawing.
3) Remove the Slider Cam ´.
4) Remove the Lever Load S Ass'y ˇ & Lever Load T
Ass'y ¨.
HOOK(A)
´ SLIDE CAM
Fig. 5-21 Gear Loading Drive, Slider Cam,
Lever T, S Load Ass'y Removal
Œ GEAR LOADING DRIVE
¨ LEVER LOAD T ASS'Y
ˇ LEVER LOAD S ASS'Y
5-4-10 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass'y Assembly
1) When reinstalling, be sure to align dot of Lever
Load T Ass'y Œ with dot of Lever Load S Ass'y ´
as shown in drawing, (Refer to Timing Point 1).
2) Insert the Pin A,B,C,D into the Slider Cam ˇ hole,
3) Be sure to align dot of Lever Load T Œ and dot of
Gear Loading Drive ¨, (Refer to Timing Point 2).
4) Aline dot of Gear Loading drive ¨ with mark of
Slider Cam ˇ as shown in drawing(Refer to
Timing Point 3).
TIMING POINT 1
Œ LEVER LOAD T
TIMING POINT 2
TIMING POINT 3
PIN A
PIN C
Fig. 5-22 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass'y Assembly
Disassembly and Reassembly
´ LEVER LOAD S
PIN D
PIN B
ˇ SLIDER CAM
5-11