Electrolux EN19WI30LS Installation Manual page 18

Condensing tankless gas water heater
Hide thumbs Also See for EN19WI30LS:
Table of Contents

Advertisement

Vent Pipe Installation
Horizontal Vent Termination- PVC/CPVC Materials Only
Intake
Exhaust
**1'
Minimum
* Not supplied with water heater,
order separately.
**1' mini
mum recommended,
but not required.
When choosing intake and exhaust terminations, you must use the
same type of elbow (i.e. both 45° elbows, or both 90° elbows).
This will help with proper combustion by putting both terminations in
the same pressure zone.
Vertical Vent Termination- PVC/CPVC Materials Only
3 ft. Min.
Roof
Storm
Flashing
Collar
Intake
Firestop/Support
Firestop
When choosing intake and exhaust terminations, you must use the
same type of elbow (i.e. both 45° elbows, or both 90° elbows).
This will help with proper combustion by putting both terminations in
the same pressure zone.
16
Hanger
Straps
Slope vent
Upwards
Insert Bird
Screen* in
End of
90 Elbow
Insert Bird
Screen* in
End of
12" over maximum
90 Elbow
snow level
or 24", whichever
12" over maximum
is greater.
snow level
Roof
Storm
or 24", whichever
Flashing
Collar
is greater.
Exhaust
Support
Firestop
Hanger
Strap
Slope
vent
Upwards
**1'
Minimum
* Not supplied with water heater,
order separately.
**1' minimum recommended,
but not required.
As illustrated on the left, make sure to keep a distance of 3' (0.9m)
or wider between the intake and exhaust when installing the vent piping.
Insert Bird Screen*
in End of 90 Elbow
The PVT-HL termination may be used in place of elbows as the
horizontal vent terminations. It is not necessary touse bird screens
with the PVT-HL termination.
Terminate at least 12" (300mm) above grade or above snow line.
3" Min.
Terminate at least 7' (2.1m) above a public walkway, 6' (1.8m)
from the combustion air intake of any appliance, and 3' (0.9m)
from any other building opening, gas utility meter, service regulator etc.
Terminate at least 3' (0.9m) above any forced air inlet within
10' (3m) , 1' (0.3m) below, 1' (0.3m) horizontally from or 1' (0.3m)
above any door, window, or gravity air inlet into any building per
National Fuel Gas Code ANSI Z223.1/NFPA 54.
Slope the horizontal vent 1/4" upwards for every 12" (300mm)
toward the termination.
Use a condensation drain if necessary.
In the Commonwealth of Massachusetts a carbon monoxide detector
is required for all side wall horizontally vented gas fuel equipment.
Please refer to Technical Bulletin TB 010606 for full installation
instructions.
As illustrated on the left, make sure to keep a distance
of 3' (0.9m) or wider between the intake and exhaust
when installing the vent piping.
Terminate at least 6' (1.8m) from the combustion air
intake of any appliance, and 3' (0.9m) from any other
building opening, gas utility meter, service regulator etc.
Enclose exterior vent systems below the roof line to limit
condensation and protect against mechanical failure.
When the vent penetrates a floor or ceiling and is not
running in a fire rated shaft, a firestop and support is
required.
When the vent termination is located not less than
8' (2.4m) from a vertical wall or similar obstruction,
terminate above the roof at least 2' (0.6m), but not
more than 6' (1.87m), in accordance with the National
Fuel Gas Code ANSI Z223.1/NFPA 54.
Provide vertical support every 3' (0.9m) or as required
by the vent pipe manufacturer's instructions.
A short horizontal section is recommended to prevent
debris from falling into the water heater.
When using a horizontal section, slope the horizontal
vent 1/4" upwards for every 12" (300mm) toward the
termination to drain condensate.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ep19wi30ls

Table of Contents