[2] MX-4110N/5110N/4111N/5111N/4112N/5112N (MAIN UNIT)
MX-5111N
1.
Unpacking
A. Unpacking procedure
1)
Remove the PP band.
2)
Remove the internal packing pads with the machine.
B. Removal of the fixing tape and protection
material
DSPF model
RSPF model
MX-5111N MX-4110N/5110N/4111N/5111N/4112N/5112N (MAIN UNIT) 2 – 1
Service Manual
KEYBOARD
standard equipment model
EXIT TRAY CABINET
standard equipment model
C. Packed items check
*1
1
No.
Name
*1
1
Developer
2
Operation manual
3
Operation manual pocket
*1: North America only.
option model
2
3
Quantity
4
1
1