Running - Panasonic KT9 Instruction Manual

Hide thumbs Also See for KT9:
Table of Contents

Advertisement

6. Running

After the controller is mounted to the control panel and wiring is completed, operate the
unit following the procedures below.
(1) Turn the power supply to the KT9 Series ON.
For approx. 3 seconds after the power is switched ON, sensor input characters and
temperature unit are indicated on the PV display, and the input range high limit value
is indicated on the SV display. See (Table 6-1).
For the DC input, for approx. 3 seconds after the power is switched ON, sensor input
characters are indicated on the PV display, and the scaling high limit value is indicated
on the SV display. See (Table 6-1).
However, if the scaling high limit value has been changed during the Scaling high limit
setting, the changed value is indicated on the SV display.)
(During this time, all outputs and the LED indicators are in OFF status)
After that, the PV (process variable) is indicated on the PV display, and SV1 or
SV2 is indicated on the SV display.
(When the Control output OFF function is working, "
PV display)
(Table 6-1)
Sensor input
K
J
R
S
B
E
T
N
PL-
C (W/Re5-26)
Pt100
JPt100
4 to 20mA DC
0 to 20mA DC
0 to
0 to 10V DC
1 to
0 to
(2) Input each set value.
Input each set value, referring to "5. Setup".
(3) Turn the load circuit power ON.
Control action starts so as to keep the control target at the SV.
PV display
1V DC
5V DC
5V DC
SV display
PV display
Scaling high limit value
28
" is indicated on the
SV display

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents