Dell Networking C9010 Installation Manual page 19

Hide thumbs Also See for Networking C9010:
Table of Contents

Advertisement

7.
Rear rail that fits into the left front rail
9.
Left spacer
Tool-less Method for a Non-Threaded-Hole Rack
1.
Attaching ReadyRails to the Rack
a.
Remove the front and rear parts of the left 4-post rail from the Dell ReadyRails kit and slide the
parts together. (The front and rear parts of a rail may arrive pre-assembled.)
b.
Install a cage nut (item 2 in Figure 11) in the left front post at the desired height of the thumb
screw on the left front rail.
c.
Install a cage nut in the left rear post at the same height as the cage nut in the left front post.
d.
Position the left rail so that the rail end labeled FRONT faces inward.
e.
Start with the rear left rail (item 3 in Figure 11); align the thumb screw with the cage nut and
holes on the left rear post. Gently press the rear rail end into the rack post and tighten the
thumb screw in the cage nut to secure the rail to the post.
f.
Align the thumb screw on the front left rail with the cage nut (items 1 and 2 in Figure 11) inserted
in the front post. Press the front end of the rail forward and tighten the thumb screw so that it
locks into the cage nut.
g.
Repeat Steps (a) through (f) to install the right rail.
h.
To remove or reposition a rail, loosen the thumb screw on each end and unseat the rail from the
rack.
Installing the Hardware
8.
Rear rail that fits into the right front rail
10.
Right spacer
19

Advertisement

Table of Contents
loading

Table of Contents