CHAPTER 6 Power Supply Facilities

1
This chapter deals with input power requirements, power supply facilities,
uninterruptible power supplies (UPS), grounding, distribution panels, distribution
lines, and the share of responsibility for construction work.
Operational stability of a server system requires a good-quality power supply. Power
supply facilities that match the power requirements of the server system must be
selected to suit the importance of the server system's operation.
6.1
Input Power Requirements
This section describes input power requirements, power requirement, and a method
for calculating rush current.
6.1.1
Input power requirements
Input power at the input power terminals of equipment must satisfy the requirements
listed in
Table
current specifications, refer to the relevant Installation Planning Manual.
C120-H007-08EN
6.1. For unit-specific input voltage, power requirement, and rush
65