Emc Requirements; Rohs; Weee; Ongoing Regulatory - Philips BDL4230E/00 Service Manual

42 inch fhd lcd public display
Hide thumbs Also See for BDL4230E/00:
Table of Contents

Advertisement

O
Europe
USA
E
NAFTA
Sa = Safety
E = Electromagnetic Compatibility
O = Other which including recycling, energy saving, ergonomics ,GreenMark
X=X-Ray
Remark:
1. Supplier to provide all approbation documents, samples before CR
2. Supplier to pay approbation samples and transportation cost.
3. Supplier to pay Switzerland approbation cost and provide EN62311 report.
4. AC/DC adaptor have to meet California Energy Commission requirement
5. Supplier have to check regulation information on rating label, carton label, user manual to meet all
mandatory regulation
6. Supplier have to apply all mandatory regulation base on sales country.
9.2

EMC Requirements

Supplier DVT EMI test result must be submitted prior to FVT samples delivery, and PVT EMI test result
must be submitted again prior to PVT samples delivery. Which also has to meet Philips' immunity testing
specification.
9.4

RoHS

Restriction on the use of certain hazardous substances.
Lead, Cadmium, Mercury, Hexavalent Chromium, Polybrominated Bipheny1 (PBB) and Polybrominated
Bipheny1 Ether (PBDE)(flame retardant).
9.5

WEEE

Producer (Philips) responsible for retailer take back schemes and recycling.
-- System implemented.
-- Collection and recycle targets.
9.6

Ongoing Regulatory

There's a possibility that other regulatory certificates will be required during the life of the product. It is the
responsibility of the supplier to provide related documentation.
10.

DQE Test Items Template

Product Release Test: DQE/DQA:
The objective of Design Quality Assurance process is to define the activities to be taken by concerning
within the Product Creation Process to manage the quality and reliability of products in a more coherent
and systematic approach.
The scope of Design Quality Assurance process covers all activities to ensure the design quality and
reliability in Product Creation Process that starts from RFQ, Kick-off, EVT, DVT and PVT, Product release
phase & Pilot run and CR & MP phase.
Design Quality Assurance procedure covers the system flow charts and the activities described as below.
General Product Specification
GB21520-2008
FCC Part 15 Class B
CECP
certificate
(
)
FCC report and
DoC
BDL4230E LCD
99
option
Supplier
al
Supplier
Yes

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents