Figure 2.25 Primequest 2400E3 With Memory Scale-Up Board/2800E3/2800B3/2400E2 With Memory Scale-Up - Fujitsu PRIMEQUEST 2000 Series Hardware Installation Manual

Hide thumbs Also See for PRIMEQUEST 2000 Series:
Table of Contents

Advertisement

CHAPTER 2 Connected Information
(High-efficiency/Standard) 200V Redundant (N+1)
It is necessary to arrange four PSUs, two FANUs, four Power cables (200 V IEC60320 C20) and two power
distribution boxes (200 V IEC60320 C19×3type) for (High-efficiency/Standard) 200V Redundant (N+1).
When the power distribution box is used, it is necessary to secure the breaker characteristic of distribution
panel. See
"2.6 Cutoff Characteristics of Distribution Panel (At the time of connecting power distribution
FIGURE 2.25 PRIMEQUEST 2400E3 with Memory Scale-up Board/2800E3/2800B3/2400E2 with Memory
Scale-up Board/2800E2/2800B2/2800E/2800B (High-efficiency/Standard) 200V Redundant (N+1)
Number
(1)
Power distribution box (200V C 19  3 type)
Description
46
box)."
CA92344-0535-06

Advertisement

Table of Contents
loading

Table of Contents