Power Supply Cable Connection (Primequest 2400E3/2400E2/2400E); Figure 2.19 Primequest 2400E3/2400E2/2400E (Standard) 100V Non-Redundant; Figure 2.20 Primequest 2400E3/2400E2/2400E (Standard) 100V Redundant (N+1) - Fujitsu PRIMEQUEST 2000 Series Hardware Installation Manual

Hide thumbs Also See for PRIMEQUEST 2000 Series:
Table of Contents

Advertisement

CHAPTER 2 Connected Information
2.3.1 Power Supply Cable Connection (PRIMEQUEST
2400E3/2400E2/2400E)
This section shows the input power system diagram of following models.
- PRIMEQUEST 2400E3
- PRIMEQUEST 2400E2
- PRIMEQUEST 2400E
(Standard) 100V Non-redundant
It is necessary to arrange three PSUs, three FANUs and three power supply cables (100 V NEMA 5-15P) for
(Standard) 100V Non-redundant.

FIGURE 2.19 PRIMEQUEST 2400E3/2400E2/2400E (Standard) 100V Non-redundant

Number
(1)
(Standard) 100V Redundant (N+1)
It is necessary to arrange four PSUs, two FANUs and four power supply cables (100 V NEMA 5-15P) for
(Standard) 100V Redundant (N+1).

FIGURE 2.20 PRIMEQUEST 2400E3/2400E2/2400E (Standard) 100V Redundant (N+1)

Number
(1)
Distribution Panel AC100V AC#0system
Distribution Panel AC100V AC#0system
Description
Description
42
CA92344-0535-06

Advertisement

Table of Contents
loading

Table of Contents