Power Cables Connections; Memory Scale-Up Board/2800E2/2800B2/2800E/2800B); Figure 2.24 Primequest 2400E3 With Memory Scale-Up Board/2800E3/2800B3/2400E2 With Memory Scale-Up Board/2800E2/2800B2/2800E/2800B (High-Efficiency/Standard) 200V Non-Redundant - Fujitsu PRIMEQUEST 2000 Series Hardware Installation Manual

Hide thumbs Also See for PRIMEQUEST 2000 Series:
Table of Contents

Advertisement

CHAPTER 2 Connected Information
2.3.2 Power Cables Connections (PRIMEQUEST 2400E3 with Memory
Scale-up Board/2800E3/2800B3/2400E2 with Memory Scale-up
Board/2800E2/2800B2/2800E/2800B)
This section shows the input power system diagram of following models.
- PRIMEQUEST 2400E3 with Memory Scale-up Board
- PRIMEQUEST 2800E3
- PRIMEQUEST 2800B3
- PRIMEQUEST 2400E2 with Memory Scale-up Board
- PRIMEQUEST 2800E2
- PRIMEQUEST 2800B2
- PRIMEQUEST 2800E
- PRIMEQUEST 2800B
(High-efficiency/Standard) 200V Non-redundant
It is necessary to arrange three PSUs, three FANUs, three power cables (200 V IEC60320 C20) and two
power distribution box (200 V IEC60320 C19×3type) for (High-efficiency/Standard) 200V Non-redundant.
When the power distribution box is used, it is necessary to secure the breaker characteristic of distribution
panel. See
"2.6 Cutoff Characteristics of Distribution Panel (At the time of connecting power distribution
FIGURE 2.24 PRIMEQUEST 2400E3 with Memory Scale-up Board/2800E3/2800B3/2400E2 with Memory
Scale-up Board/2800E2/2800B2/2800E/2800B (High-efficiency/Standard) 200V Non-redundant
Number
(1)
Power distribution box (200V C 19  3 type)
Description
45
box)."
CA92344-0535-06

Advertisement

Table of Contents
loading

Table of Contents