Upon Reception; What This Chapter Contains; Delivery Inspection; Unpacking Instructions - ABB PQFS Installation, Operation And Maintenance Instructions

Power quality filter
Table of Contents

Advertisement

3

Upon Reception

3.1

What this chapter contains

This chapter gives basic information on how to inspect, transport, identify and store the
PQFS active filter.
3.2

Delivery inspection

Each PQFS is delivered in a box designed to protect adequately the equipment during
shipment. Upon reception of the equipment, make sure that the packing is in good
condition. Verify the state of the shock and tilting indicators (if mounted on the enclosure
or on the filter panels).
3.3

Unpacking instructions

After removal of the top cover, check visually the exterior and interior of your filter for
transportation damage.
Your filter equipment comes with a package. Verify that all items are present, i.e.:
Any loss or damage should be notified immediately to your ABB representative.
3.4

Lifting and transportation guidelines

Please note that filter equipment weighs approximately 120 kilograms. Care should be
taken to ensure that correct handling facilities are used.
In order to transport the equipment use a forklift or similar equipment. PQFS enclosures
are best transported horizontally.
Figure 1: PQFS packing material opened
· this manual
· the electrical drawing
· the fixation bar and filter blocking screws
· the lifting ribbon + 2 pieces of rubber used to protect the ribbon
· the rubber seal to cover a knock-out (to be used for multi-unit operation)
· the communication cable needed for multi-unit operation
Manual Power Quality Filter PQFS ç Upon reception 9

Advertisement

Table of Contents
loading

Table of Contents