ABB ACS550-01 User Manual page 28

Hide thumbs Also See for ACS550-01:
Table of Contents

Advertisement

28
Wiring IP21 / UL type 1 enclosure with conduit
1. Open the appropriate knockouts in the conduit/gland
box. (See section
2. Install thin-wall conduit clamps (not supplied).
3. Install conduit/gland box.
4. Connect conduit runs to box.
5. Route input power and motor wiring through
conduits (must be separate conduit runs).
6. Strip wires.
7. Connect power, motor and ground wires to the drive
terminals. See the table on the right for tightening
torques.
Note: For R6 frame size, refer to section
terminal considerations – R6 frame size
281.
8. Route the control cable through the conduit (must be
separate from input power and motor conduit runs).
9. Strip the control cable sheathing and twist the copper
shield into a bundle (pig-tail).
10. Connect the ground shield bundle (pig-tail) for digital
and analog I/O cables at X1-1. (Ground only at the
drive end.)
11. Strip and connect the individual control wires to the
drive terminals. See section
on page 24. Use a tightening torque of 0.4 N·m
(0.3 lb·ft).
12. Install the conduit/gland box cover (1 screw).
Installation
Conduit/Gland kit
on page 19.)
Control terminals table
ACS550-01/U1 User's Manual
2
3
7
7
5
4
Power
Frame
size
on page
R1, R2
R3
R4
R5
R6
10
11
8
X0007
X0005
IP2004
Tightening torque
N·m
lb·ft
1.4
1
2.5
1.8
5.6; PE: 2
4; PE 1.5
15
11
40; PE: 8
30; PE: 6
IP2005

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs550-u1

Table of Contents