Mitsubishi Electric GOT2000 Series User Manual page 60

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Step 2.
Touch the [OK] button to restart the GOT and reflect the setting.
To cancel the setting, touch the [Cancel] button to return to the main menu.
■2. Ethernet extension port and Ethernet standard port 2
(1) IP address, subnet mask, default gateway, peripheral software port No., and transparent port No.
Step 1.
Touch the selection for [Ethernet comm. unit] to switch to [Effective].
Step 2.
Touch the entry box for the setting item to display a software keyboard.
Input a value with the keyboard.
Example) For GT27
Step 3.
Touch the [OK] button to restart the GOT and reflect the setting.
To cancel the setting, touch the [Cancel] button to return to the main menu.
2 - 16
2.4 IP Address
POINT
POINT
POINT
Assignment to an extension interface
The Ethernet extension port is assigned to an unused extension interface with the lowest stage
number.
If all extension interfaces are occupied, the Ethernet extension port cannot be assigned.

Advertisement

Table of Contents
loading

Table of Contents