NEC SL2100 Getting Started Manual page 39

Hide thumbs Also See for SL2100:
Table of Contents

Advertisement

SL2100 GETTING STARTED GUIDE
4)-1. When both VOIPDB-C1 and EXIFB-C1 boards are mounted on the CPU board, refer to
the following installation.
5) Insert the CPU board in the guide rail of chassis and push it securely into position, and
tighten the two screws.
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents