Figure 2-51 Connect Battery Connection Cable; Figure 2-52 Installation Of The Front Cover - NEC SL1100 Hardware Manual

Hide thumbs Also See for SL1100:
Table of Contents

Advertisement

SL1100
9.
Reconnect the Battery Connection Cable to the Fuse Unit.
Battery Connection Cable
10. Align tabs a to f to holes A to F on Battery Box. Slide the Front Cover into position and tighten the
two screws.
f
Front cover
2-34
Fuse Unit

Figure 2-51 Connect Battery Connection Cable

d
b
e

Figure 2-52 Installation of the Front Cover

F
D
B
c
a
A
Two screws
(with stopper)
ISSUE 4.1 (R5.1)
E
C
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents