SL1100
4.
Pull out the Sub-Cover by pushing out the tabs.
• The Sub-Cover can be opened and held in the open position.
5.
Align the four holes on the back of the KSU with the four screws installed in the wall.
Screw head
Screw head
6.
Slide the KSU into position and tighten the lower two screws.
2-6
Sub-Cover
Tab
Figure 2-7 Removing the Sub-Cover
Push to hold
Figure 2-8 Sub-Cover Open Position
Hook
Figure 2-9 Mounting the KSU
Tab
Open
Fasten screws
ISSUE 4.1 (R5.1)
Installation