Installing An Sfp Optical Port - Siemens RUGGEDCOM RX1400 Installation Manual

Hide thumbs Also See for RUGGEDCOM RX1400:
Table of Contents

Advertisement

RUGGEDCOM RX1400
Installation Guide
Figure 12: LC Port
1. Tx Connector
2. Rx Connector
Each port features an LED that indicates its link state.
State
Green (Solid)
Green (Blinking)
Off
NOTE
SFP ports can be safely inserted and removed while the chassis is powered and operating.
The following sections describe how to install and remove SFP optical ports:
Section 3.2.1, "Installing an SFP Optical Port"
Section 3.2.2, "Removing an SFP Optical Port"
Section 3.2.1

Installing an SFP Optical Port

To install an SFP optical port, do the following:
CAUTION!
Electrical hazard – risk of damage to equipment. Use only components certified by Siemens with
RUGGEDCOM products. Damage to the module and device may occur if compatibility and reliability
have not been properly assessed.
CAUTION!
Electrical hazard – risk of damage to equipment. Make sure all electrostatic energy is dissipated
before installing or removing components from the device. An electrostatic discharge (ESD) can cause
serious damage to the component once it is outside the chassis.
1.
Make sure all potential electrostatic build-up has been properly discharged to prevent electrostatic
discharges (ESD). This can be accomplished by wearing an ESD wrist strap or by touching Earth or the
chassis ground.
2.
Remove the dust cover from the port opening in the module.
CAUTION!
Mechanical hazard – risk of component damage. SFP optical ports are designed to insert in only
one orientation. Do not force the port into the module.
3.
Remove the port from its packaging.
Installing an SFP Optical Port
1
2
Description
Link established
Activity
No link detected
Chapter 3
Communication Ports
17

Advertisement

Table of Contents
loading

Table of Contents