Huawei RRU3268 Installation Manual page 11

Hide thumbs Also See for RRU3268:
Table of Contents

Advertisement

RRU3268
Installation Guide
Topic
3.5.1 Clearance for a Single RRU
3.5.2 Clearances for Three or More RRUs
Installing an RRU Alarm Cable
3.4 Installation Scenarios
Compared with issue 04 (2013-12-30), this issue does not include any new information and
no information is deleted from this issue.
04 (2013-12-30)
This is the fourth official release.
Compared with issue 03 (2013-12-23), this issue includes the following change:
Topic
3.4 Installation Scenarios
Compared with issue 03 (2013-12-23), this issue does not include any new information and
no information is deleted from this issue.
03 (2013-12-23)
This is the third official release.
Compared with issue 02 (2013-06-26), this issue includes the following change:
Topic
7.1 Hoisting an RRU onto a Tower
Compared with issue 02 (2013-06-26), this issue does not include any new information and
no information is deleted from this issue.
02 (2013-06-26)
This is the second official release.
Compared with issue 01 (2013-04-28), this issue includes the following change:
Issue 10 (2015-12-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1 Changes in the RRU3268 Installation Guide
Change Description
Added the clearance for a single RRU or
multiple RRUs on the bitumen ground.
Added notes under the procedure.
Added restrictions on RRU mounting kits in
assembled installation mode.
Change Description
Modified the figure showing the U-steel
specifications.
Change Description
Optimized the procedure for hoisting an
RRU onto a Tower.
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dbs3900Rru32682g6

Table of Contents