GE C70 Instruction Manual page 362

Capacitor bank protection and control system
Hide thumbs Also See for C70:
Table of Contents

Advertisement

SYSTEM SETUP
Configuring a composite curve with an increase in operating time at increased pickup multiples is not allowed. If
this is attempted, the EnerVista software generates an error message and discards the proposed changes.
5.5.6.5 Standard recloser curves
5
The following graphs display standard recloser curves available for the C70.
5-158
Figure 5-76: Composite recloser curve with HCT enabled
Figure 5-77: Recloser curves GE101 to GE106
C70 CAPACITOR BANK PROTECTION AND CONTROL SYSTEM – INSTRUCTION MANUAL
CHAPTER 5: SETTINGS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents